国产重口老太和小伙乱,国产精品久久久久影院嫩草,国产精品爽爽v在线观看无码 ,国产精品无码免费专区午夜,国产午夜福利100集发布

 
Home> QINGDAO

Qingdao pier project begins caisson installation

Updated: 2014-01-10

  Print Mail Large Medium  Small 0

The Qingdao pier project, contracted for construction by China State Construction Port Engineering Group as part of the national deep-sea base program, began caisson installation recently. The project will be finished by the end of the year.

The pier platform is 280 meters long, 50 meters wide and 10 meters deep. It has an approach bank that measures 393 meters high and 17 meters wide. The side facing the coast is made of caissons and the side facing the sea consists of breakwater structures. The program will consume 800,000 cubic meters of earth and stone.